Loading ...

Blob

Smart Reasoning:

C&E

See more*

Qaagi - Book of Why

Causes

Effects

if you wantto painta slope

that Increase the thickness of the spacersto createslope

2 storeysseton slope

the 2 wallscreatinga slope

14.2 Factorscausingslope

to be 0 to 500 nm , more preferably(passive) is setslope S

the use of stairs ... some incomprehensible wayto createa slope

to be flown off hills , where the lift needed to keep the model aloft(passive) are designedSlope Slope Soarers

the easiest wayto createslope

to be some additional top soilto createa slope

the forward wing motioncausingslope

The value of 20 meterswill createa slope

to add more soilto createa slope

the value of total resistance 110(passive) set bya slope

2-bay cottagesseton slope

the use of 2 squaresto seta slope

If there are any areas that do n’t slope away from your foundation , fill them in with soilto createa slope

propped up against a chairto createa slope

road construction(passive) caused byslope

discretionarilyCuts off the water(passive) can be designedslope

the second most important factortriggeringslope instabilities

as they rest on the top of the stairsto createa slope

To help with water runoff , I recommendcreatinga slope

Our trail ... a slab of snowcreateda slope

patio , new top soil , fabric and stone(passive) caused byslope

Not sure about the mortar mixto createa slope

then cut all the way to the topcreatinga slope

Questions0 “Good wayto designslope

outcrop ... slides and slumpsoriginatedup - slope

on slopes between 2 and 6 percent(passive) Should be designedSlope

the portion 5 - 1composedof the slope

I built it up on the sides of the baseto createa slope

discretionarily Machine Dimension(passive) can be designedslope

beveled wood siding in frame wall opening at sillto createslope

the 2017 Ischia earthquake(passive) triggered byslope instabilities

concentrated run - off Gully erosion- large channels on a slope caused by intense run - off These three types of erosion(passive) caused bya slope

5 mM(passive) caused byfEPSP slope

varying the thickness of the bedto createa slope

how to cut a window sill bsi windows can be a paincontinuous insulation and punched b install beveled wood siding in frame opening at sillto createslope

to 0 ms(passive) can be setSlope

away from the houseleadingaway from the house

back from the beachsetback from the beach

towards the beachleadstowards the beach

to the beach beyond itleadingto the beach beyond it

rain and snowmelt to flow towards the housecausingrain and snowmelt to flow towards the house

from the house to Fairy Glenledfrom the house to Fairy Glen

down to Los Cajones beachleadingdown to Los Cajones beach

to a literally private beachleadingto a literally private beach

to the water ’s edgeleadingto the water ’s edge

to the garage for 3 cars underneath the houseleadingto the garage for 3 cars underneath the house

from the gently sloping shelf up to the beachleadingfrom the gently sloping shelf up to the beach

you into the saline waterleadsyou into the saline water

to repel waterdesignedto repel water

down toward the waterleadsdown toward the water

pooling of waterto preventpooling of water

down to and up from the water crossingleadingdown to and up from the water crossing

up to a double front doorleadingup to a double front door

water to run off rather than enter the soil 12may causewater to run off rather than enter the soil 12

to the beach and the car should be maneuvered very slowly on this slopeleadsto the beach and the car should be maneuvered very slowly on this slope

to the pool area and the entrance door Els Vents 8leadingto the pool area and the entrance door Els Vents 8

water to run off into the lakecausedwater to run off into the lake

for smooth drainage of wateris createdfor smooth drainage of water

from road to riverleadingfrom road to river

on a rising edgetriggeringon a rising edge

to 0.1setto 0.1

at 2 to 1setat 2 to 1

to the back again of the workplace buildingleadingto the back again of the workplace building

to the back again of the office buildingleadingto the back again of the office building

optimal comfort and hand / wrist positioningcreatesoptimal comfort and hand / wrist positioning

to the cottage from the car parkleadingto the cottage from the car park

from the wharf to the level of the waterleadingfrom the wharf to the level of the water

water from pooling up and saturatingto preventwater from pooling up and saturating

up to the entrance to receptionleadingup to the entrance to reception

to front entranceleadingto front entrance

river bank erosion and geomodification potential(passive) influenced byriver bank erosion and geomodification potential

to guide rain water into the roaddesignedto guide rain water into the road

to higher ground 4 waterleadsto higher ground 4 water

up to Dark Mountain’s unvisited crestleadingup to Dark Mountain’s unvisited crest

to lake front Accessionleadingto lake front Accession

to the back pointleadingto the back point

Blob

Smart Reasoning:

C&E

See more*